2003 |
Took Possession of building from the City of Pomeroy | ||||||||||||||||
October
2005 |
Danna Garrett put down new tile floor in the main room downstairs | $1065.00 | |||||||||||||||
September
2006 |
Steve White with help from the prisoners from NCCI at Rockwell City removed the drop ceiling, pulled long rods through roof and completely repainted entire main room. New Roof in September of 2006. | $9800.00 |
|||||||||||||||
May
2007 |
Plumbing to get water to outside and to the new bathroom sink and stool | $293.00 | |||||||||||||||
May
2008 |
Johnson
Bros replaced missing marble in entry way and south downstairs wall. Got
missing marble from Carroll |
$1120.00 | |||||||||||||||
June
2008 |
Rebuild bathroom from scratch, new sink, stool, medicine cabinet, towel dispenser, Ceiling light fixture, new floor. | $695.00 | |||||||||||||||
April
2008 |
Covered brick wall with paneling and put a slotted 4 x 8 sheet on the south wall of middle room going to bathrooom, new floor, replaced light fixture with strip lighting. | $379.00 | |||||||||||||||
June
2009 |
Covered brick wall waterproofed and drywall (upperoom), texture was done by Don Langenwalter | $1160.00 | |||||||||||||||
July
2009 |
New floor upstairs and stairway | $1068.00 | |||||||||||||||
|
|||||||||||||||||